Your LVCC booth plan must follow both the venue requirements and your specific show’s exhibitor manual. This checklist helps you prepare the brief; it does not replace the organiser’s current rules, contractor approvals or service orders.
Which documents should be checked first?
Confirm your event, hall, booth allocation and open sides. Obtain the current exhibitor service manual and the LVCC facility guidance. Use those documents to agree drawing approvals, contractor permissions, freight targets and service-order deadlines.
How much time is available for installation?
There is no single move-in or dismantling window that applies to every LVCC show. Use the timetable for your assigned hall and booth. Agree delivery, equipment positioning, booth assembly, inspection and collection responsibilities against those times.
What belongs in the design approval package?
Include dimensions, materials, height, accessibility, structural details and any overhead elements. Identify product demonstrations, electrical requirements and activities that may need permission. Ask the organiser or relevant authority to confirm requirements for your specific design before production.
How should freight and services be budgeted?
Separate booth construction from shipping, material handling, utilities, internet and other show-contractor services. Confirm the receiving address, labelling, storage and empty-container arrangements. Do not assume delivery to the venue means equipment can be taken directly to the booth.
What about sound, photography and demonstrations?
Check the current show policies rather than relying on a universal noise limit or photography rule. Brief staff on visitor circulation, neighbouring stands, equipment security and permitted activities. Resolve special demonstration requirements before opening day.
What should the quote request include?
Send the event name, hall plan, booth dimensions in feet, products, display requirements, service manual and budget in USD. Sensations Exhibits can discuss custom or rental options and identify the agreed delivery responsibilities in an itemised proposal.
